The following procedures and sections were updated with Version 5.0 of the Panther System Service Manual.
Installation and Operational Procedures
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
New topic |
N/A |
List of uncrating procedures |
|
|
|
Remove all screws labeled OPEN Here that secure the upper panel Added image |
Remove the 12 screws from the upper panel Removed image |
Based on update to packing crate |
|
Remove all screws labeled OPEN Here that secure the ramp to the crate Added image |
Remove the 14 screws that secure the ramp to the crate. Screws will be labeled Open Here. Removed image |
Based on update to packing cratge |
|
|
Remove the screws that secure the holding blocks and remove the two blocks Image |
Remove the 4 screws that secure the holding blocks and remove the two blocks Image |
Based on update to packing crate |
|
|
Inspect the inside of the crate for any loose objects from the Panther instrument that may have fallen off during shipping. |
N/A |
Based on FSE experience uncrating the instrument |
|
|
New topic |
N/A |
New Crate |
|
|
New topic |
N/A |
New crate |
|
|
Revised to match new IOPQ Procedures |
N/A |
Based on verifications of installation procedures by service engineers. |
|
|
When rolling the instrument, make sure the feet are in the up position. Moving the instrument with the feet in the down position can bend the stabilizing rods. |
N/A |
Warning based on field service experience |
|
|
Warning—Microswitches may be damaged due to their sensitivity. Use extra caution when installing them. Apply very slight torque on the switch because excessive torque can impede movement of internal components. |
N/A |
Switches are being damaged in the field. Revision of procedure. |
|
|
New topic |
N/A | New procedure | |
|
Anti-seize the Instrument feet:
|
N/A |
New procedure |
|
|
New topic |
N/A |
New procedure |
|
|
Greasing the Waste Bottle Fittings and O-Rings (under Instrument Setup) |
New topic |
N/A |
New procedure |
|
Retrieve the Output Queue Lid from the Universal Fluids Drawer and install it on top of the Output Queue. |
N/A |
New procedure | |
| Disconnecting the Site Wiring Fault Alarm |
N/A |
New procedure |
|
|
N/A |
N/A |
Revision of Software Installation and workflow. Based on verifications of installation procedures by service engineers. |
|
|
Selecting the System Software Language |
N/A |
New procedure |
|
| Barcodes were improved for higher resolution. |
N/A |
To provide high resolution copy of barcodes |
|
|
Enabling PRO360° Remote Diagnostics on a Panther Instrument |
N/A |
New procedure |
|
|
|
Configuring the Panther System PC with a Static IP address |
N/A |
GP11-217-FSN; Remote Diagnostics (RDxM) Installation Procedure |
|
|
Checking PRO360° Remote Diagnostics connectivity from the Dashboard Software |
N/A |
New procedure |
|
|
Checking PRO360° Remote Diagnostics Connectivity with Technical Support |
N/A |
New procedure |
|
Remote Service Link |
New topic |
N/A |
New procedure |
|
Laboratory Information System (LIS) |
New topic |
N/A |
GP11-206-FSN; System LIS Installation Instructions |
|
Revision of the alignment procedure |
N/A |
Clarification |
|
|
|
Setting the Authorization code |
N/A |
New procedure |
|
Revision of the Auto-teaching procedure |
N/A |
Change of workflow in the Auto-teaching software. |
|
|
New topic |
N/A |
New procedure |
|
|
New topic |
N/A |
New procedure |
|
|
Verify fittings are hand-tight. |
N/A |
Based on field service experience. |
|
|
2 MTUs per each OQ cycle |
N/A |
Clarification |
|
|
|
Time Required |
N/A |
Clarification |
|
|
Clear MTUs |
N/A |
Clarification |
|
Pre-Site Evaluation Form |
Added information to the Networking Configuration section |
N/A |
P10233-0473, Rev B; Panther System Pre-site Evaluation Based on verifications of installation procedures by service engineers. |
|
Updated procedure |
N/A |
Based on verifications of installation procedures by service engineers. |
|
|
Added higher resolution barcodes |
N/A |
To provide high resolution copy of barcodes |
|
|
Placing the SysCheck Reagent tubes with the barcodes facing inwards. |
N/A |
Based on verifications of installation procedures by service engineers. |
|
|
Enter 3 for the number of replicates |
N/A |
Based on verifications of installation procedures by service engineers. |
|
|
Select Enabling Auto Sample ID Assignment for Unreadable Barcodes |
N/A |
Based on verifications of installation procedures by service engineers. |
|
|
Steps for updating the Calibration Factor in Service Software: These steps should be followed for Service Software V 3.2.1 and below. Do not perform these steps for Software V 3.2.2 and above. |
N/a |
Based on verifications of installation procedures by service engineers. |
Packing and Relocation Procedures
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
New—Packing Checklist New—Packing the Accessory Kit New—Packing the Marketing Kit |
N/A |
GP11-227-FSN; Panther Relocation Procedure |
Maintenance Procedures
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
Edits |
N/A |
Based on verifications of maintenance procedures by service engineers. |
|
|
Panther Preventative Maintenance 6-Month Interval |
Edits |
N/A |
Based on verifications of maintenance procedures by service engineers. |
|
Panther Preventative Maintenance 12-Month Interval |
Edits |
N/A |
Based on verifications of maintenance procedures by service engineers. |
|
Edit |
N/A |
Based on verifications of maintenance procedures by service engineers. |
Tools
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
Edits |
N/A |
Addition of new tools |
Service Procedures
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
Edits |
N/A |
N/A |
|
|
New topic |
N/A |
Based on Field Service experience |
|
|
New topic |
N/A |
Based on verifications of Darkcount procedures by service engineers. |
|
|
New topic (Scanner barcodes) |
N/A |
To provide high-resolution copy of barcodes. | |
|
Updated screen shots |
N/A |
To reflect new software. | |
|
Updated image |
N/A |
Clarifications | |
|
Updated screen shots |
N/A |
To reflect new software. | |
|
Select Initialize |
N/A |
Clarification | |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
New topic |
N/A |
Separated the installation of printers into two separate topics. this is a list topic. | |
|
|
Close Service Software |
N/A |
Clarification |
|
Updated screen shots |
N/A |
To reflect new software. | |
|
Updated screen shots |
N/A | To reflect new software. | |
|
Be sure to put the Luminometer injectors back AFTER closing the drawer. |
Be sure to put the Luminometer injectors back in before closing the drawer. |
Clarification |
|
|
|
New image of the open Service Drawer |
N/A |
Clarification |
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Added Scope and Time Required |
N/A |
Clarification |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
After turning the locks to the locking position, push the drawer in to ensure proper locking. |
N/A |
Clarification |
|
|
Added Scope and time Required |
N/A |
Clarification |
|
|
Edits |
N/A |
Clarification |
|
|
Wipe the instrument with deionized water. Allow the instrument to dry thoroughly. |
Wipe te tool with deionized water. Allow the tool to dry thoroughly. |
Clarification |
|
|
New topic |
N/A |
Based on verifications of Alignment procedures by module owner. |
|
|
Edits |
N/A |
Based on FSN GP11-225 and verifications of SysCheck procedures by service engineer. |
|
|
Edits |
N/A |
Based on FSNs GP10-216 and GP11-225. |
|
|
New barcode images |
N/A |
Based on FSNs GP10-216 and GP11-225. |
|
|
Flashcheck Material Tables |
N/A |
Deleted topic. Incorporated info into procedure topic |
Formatting change. |
|
SysCheck Material Tables |
N/A |
Deleted topic. Incorporated info into procedure topic. |
Formatting change |
Removal and Replacement Procedures
| Topic | Additions | Deletions | Justification |
|---|---|---|---|
|
Added Caution—Use special care when disconnecting the sensors. DO NOT pull on the sensor wires to disconnect the connector from the PCB. The sensor wires are fragile. |
N/A |
Based on field service experience. |
|
|
Fill the temperature sensor hole with heat sink compound prior to inserting the thermistor. Make sure there is no excess compound outside of the hole. Wipe clean/wipe excess heat sink compound after inserting the thermistor. Image |
Fill the temperature sensor hole with heat sink compound. Make sure there is no excess compound outside of the hole. |
Based on field service experience. Clarification |
|
|
Edits |
N/A |
Clarifications | |
|
New topic |
N/A |
GP11-228-FSN; Incubator Pulley Replacement Belt Tensioning. |
|
|
Edits |
N/A |
Clarification |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
New topic |
N/A |
New procedure verified by module owner. |
|
|
New topic |
N/A |
New procedure verified by module owner. |
|
|
New topic |
N/A |
Distributor Hook Leveling Instructions |
|
|
Clear MTUs |
N/A |
Based on field service experience. |
|
|
Clear MTUs |
N/A |
Based on field service experience. |
|
|
Clear MTUs |
N/A |
Based on field service experience. |
|
|
Image of AD Pump connectors |
N/A |
Clarification |
|
|
|
|
Image of injector tubing |
Clarification |
|
Verification Perform a Luminometer Darkcount Procedure |
N/A |
New procedure |
|
|
Clear MTUs |
N/A |
Based on field service experience |
|
|
Luminometer PMT |
N/A |
To add new procedure |
|
|
New topic |
N/A |
New topic verified by module owner. |
|
|
Clear MTUs |
N/A |
Based on field service experience. |
|
|
Clear MTUs |
N/A |
Based on field service experience. |
|
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Edits |
N/A |
Updated procedure verified by module owner. | |
|
Allen wrench, 2.5 mm |
N/A |
Updated procedure verified by module owner. |
|
|
|
|
(does not include re-teaching the Distributor) |
Clarification |
|
Remove the two nuts |
Remove the two screws |
Clarification |
|
|
N/A |
(does not include re-teaching the Distributor) |
Updated procedure verified by module owner. |
|
|
Allen wrench, 4 mm |
N/A |
Updated procedure verified by module owner. |
|
|
Allen wrench, 2.5 mm |
N/A |
Updated procedure verified by module owner. |
|
|
|
N/A |
(does not include re-teaching the distributor) |
Updated procedure verified by module owner. |
|
Alignment/Calibration Install firmware. |
N/A |
Updated procedure verified by module owner. |
|
|
N/A |
(does not include re-teaching the Distributor) |
Updated procedure verified by module owner. |
|
|
New image |
N/A |
Updated procedure verified by module owner. |
|
|
Output Queue Hook Loader Home Sensor Removal and Replacement |
N/A |
(does not include re-teaching the Distributor) |
Updated procedure verified by module owner. |
|
|
Allen wrench, 2.5 mm Allen wrench, 4 mm |
Allen wrench, 5.5 mm |
Clarification |
|
45 minutes |
30 minutes |
Updated procedure verified by module owner. |
|
|
|
Clear MTUs. |
N/A |
Updated procedure verified by module owner. |
|
New image |
N/A |
Updated procedure verified by module owner. |
|
|
N/A |
Verification Verify that pressure reaches its specification. |
Clarification |
|
|
Heat sink compound |
N/A |
Clarification |
|
|
|
New image of thermistor with compound |
N/A |
Clarification |
|
N/A |
Loosen the two large slot head screws at the rear corners of the module. These screws are covered by foam insulation that will need to be displaced in order to access the screws. |
Clarification |
|
|
Note—The shoulder screws do not need to be loosened or removed upon removing the module Image |
N/A |
Clarification |
|
|
Heat sink compound |
N/A |
Clarification |
|
|
|
New images of inserting thermistor |
N/A |
Clarification |
|
|
Updated screen shots |
N/A |
Clarification |
|
Remove the front cover. |
N/A |
Clarification |
|
|
|
Note—The shoulder screws do not need to be loosened or removed upon removing the module. Image |
Using a slotted screwdriver, loosen the two large slot head screws at the rear corners of the module. These screws do not need to be completely removed, just loosened enough to allow the module to slide out from under them. Image |
Updated procedure verified by module owner. |
|
Updated screen shots |
N/A |
To reflect new software. |
|
|
Updated screen shot |
N/A |
To reflect new software. |
|
|
Clear MTUs. |
N/A |
Based on field service experience. |
|
|
Updated screen shot |
N/A |
To reflect new software. |
|
|
Plug in the CAN cable. |
Plug in the COP cable. |
Clarification |
|
|
Clear MTUs. |
N/A |
Based on field experience. |
|
|
Updated screen shot. |
N/A |
To reflect new software. |
|
|
If the liquid waste bottle was flooded, drain the coalescing trap at this time. (moved up in list) |
N/A |
Clarification | |
|
|
Connect the vacuum filter with the rubber piece to the coalescing trap. |
Connect the vacuum filter with the rubber piece to the waste trap. |
Clarification |
|
New image of PCB |
N/A |
Updated procedure verified by module owner. |
button at the top of the page to send feedback, comments, or change requests.