Front Marketing Panel Installation

Time Required

  • 15 minutes

Procedure

  1. Locate the Front Marketing Panel from the unpacked Marketing Kit crate.
  2. ClosedInstall the front panel with 4 mm screws located next to the three incubators.
  3. If this is an installation, continue to Install Hand-held Barcode Scanner.