ClosedCommunication and Organization Processor (COP) Module

The Panther CAN-Bus-Terminator Installation was cut in on production Panther Systems P2242 and above.

Install Required Factory Installed Required for Panther Required for Fusion
P0000 - P2241 P2242 and above Yes Yes

ClosedMonitor

The Panther LCD Monitor was installed on production Panther Systems P0000 to P1402.

Factory Installed
P0000 and P1402

The Panther LED Monitor was cut in on production Panther Systems P1405 to P2306.

Factory Installed
P1405 and P2306

A New VGA Cable was cut in on production Panther Systems P1589 and above.

Install on Failure Factory Installed
P0000 - P1589 P1589 and above

The Panther PCAP Monitor was cut in on production Panther Systems P2306 and above.

Optional Upgrade on Panthers
(To Be Purchased by Customer)

Factory Installed Mandatory Install on Fusions
P0000 - P2306 P2307 and above Yes

ClosedPipettor Module

Please refer to the most current Technical Bulletins for up to date implementation information.

All Panther PLUS instruments from manufacturing are built with BLDC pipetors.

The BLDC pipettors were cut in on production Panther (only) Systems P03499, 03510, 03511, P03542 and above.

Factory Installed on Panther ONLY Systems (Classic Panther)
P03499, P03510, P03511, P03542 and above
Note—
BLDC Pipettors can ONLY be installed with System Software v7.1 or higher.

For Panther Systems, the Sample and Reagent Pipettors MUST be of the same type.
For Fusions Systems, the Panther side (Sample and Reagent Pipettors) MUST be of the same type.
The Fusion Pipettor can be either an APP or BLDC Pipettor.

The table below represents the only viable pipettor configurations for standalone Panther or Panther Fusion systems:

SYSTEM Sample Pipettor Reagent Pipettor Fusion Pipettor
Panther APP APP APP or BLDC
Panther Fusion BLDC BLDC APP or BLDC

BLDC Pipettor Information

ClosedPumps Module

A New LCMP Vacuum Seal may be required for system installs at high elevations.

ClosedReagent Bay Module

Please refer to the most current Technical Bulletins for up to date implementation information.

Barcode Scanner Information

Thermal Sensor Ranges for Aptima Assays

ClosedSample Bay Module

Please refer to the most current Technical Bulletins for up to date implementation information.

Barcode Scanner Information

Thermal Sensor Ranges for Aptima Assays

ClosedTarget Capture Reagent (TCR) Module

TCR Mixer Drip Shield was cut in on production Panther Systems P0354 and above.

Mandatory Install Required on Factory Installed
P0000 - P0353 P0354 and above

Molded TCR Carousel was cut in on production Panther Systems P0827 and above.

Install as needed Factory Installed
P0000 - P0826 P0827 and above

TCRClosedTarget capture reagent—An assay-specific reagent added as part of specimen pipetting. Door Laser block was cut in on production Panther Systems P1301 and above.

Mandatory Install Required on Factory Installed
P0000 - P1300 P1301 and above

TCR Door Grounding Brush was cut in on production Panther Systems P1560 and above.

Mandatory Install Required on Factory Installed
P0000 - P1559 P1560 and above

ClosedTip Drawers Module

Please refer to the most current Technical Bulletins for up to date implementation information.

 

Mid Bay

ClosedChiller Ramp Module

The New Chiller Ramp was cut in on production Panther Systems P0681 and above.
Installation of the New Chiller Ramp requires an exhaust fan and vent. Please click the hyper link for details.

Install on Failure Factory Installed
P0000 - P0680 P0681 and above

ClosedDistributor Module

Panther Updated Linear Distributor was cut in on production Panther Systems P02067 - 02076, and P02089 and above.

Install On Failure Factory Installed
P0000 - P02066 P02067-P02076,
P02098 and above

ClosedIncubators Module

Panther Incubator Weights were cut in on production Panther Systems High Temp-P0655, Transition-P0654, Amp-P0642 and above.

Install Optional Factory Installed
P0000 - P0641 P0655 and above

Panther New Molded Incubator Door with door screw on High Temp was cut in on production Panther Systems P0916 and above.

For Systems Factory Installed

P0000 - P0916 Install on Failure

If no door screw is present ensure
Incubator door clip
is installed

P0916 and above

Panther New Molded Incubator Door with door screw on Trans and Amp were cut in on production Panther Systems P0919 and above.

Install Optional Factory Installed

P0000 - P0919

If no door screw is present ensure
Incubator door clip
is installed

P0919 and above

Panther Incubator Amp Inc Form Plugs were cut in on production Panther Systems P1251, P2153 and above.

Mandatory Install if RTFs present Factory Installed
P0000 - P1250 & P1252 P1253 and above

Panther New Incubator Shims and Belt were cut in on production Panther Systems P2562 and above.

Install on Failure Factory Installed
P0000 - P2561 P2562 and above

Thermal Sensor Ranges for Aptima Assays

ClosedInput Queue Module

Panther New Input Queue was cut in on production Panther Systems P1264 and above.

Install on Failure Factory Installed
P0000 - P1263 P1264 and above

ClosedLoad Stations Module

Please refer to the most current Technical Bulletins for up to date implementation information.

ClosedLuminometer Module

Panther Luminometer Ferrite on PMTClosedPhotomultiplier tube was cut in on production Panther Systems P0169 and P0172 and above.

Install on Failure Factory Installed
P0000 - P0168 P0172 and above

ClosedMagnetic Parking Module

Please refer to the most current Technical Bulletins for up to date implementation information.

ClosedMagnetic Wash Module

Please refer to the most current Technical Bulletins for up to date implementation information.

ClosedOutput Queue Module

Please refer to the most current Technical Bulletins for up to date implementation information.

ClosedTip Eject Chute Module

The New Sample Tip Eject Chute was made available for BloodBank systems ONLY.

 

Lower Bay

ClosedCooling Module

Panther New Cooling Module (Dual Fan) was cut in on production Panther Systems P0734 and above.

Install as needed Factory Installed
P0000 - P0733 P0734 and above

ClosedPC

Dell XE2 was cut in on production Panther Systems P1493 and above.

Install as needed Factory Installed Required for Panther Required for Fusion
P0000 - P1492 P1493 and above No Yes

Dell XE2 with 16GB RAM

Factory Installed Required for Panther Required for:
P2671 No System SW v7
Panther PLUS
Panther Link

Dell XE2 Minitower was cut into Panther ONLY production on System P3202 and above.

Factory Installed
P3202

Dell XE3 was cut into Panther production as Panther (only) Systems on P03499, 03510, 03511, P03542 and above.

Factory Installed on Panther ONLY Systems (Classic Panther)
P03499, P03510, P03511, P03542 and above

The following PCs require a BIOS configuration update before Imaging (Change SATA Operation to RAID ON) .

PC BIOS Settings before Imaging (SATA RAID On)

PC Part Number Part Description
CMP-01711 / RCMP-01711 Dell OptiPlex XE2, 16GB
CMP-01672 Dell OptiPlex XE3, 16GB

ClosedUniversal Fluid Drawer Module

No Latches can be installed on Systems 001 - 0099 as the frame / chassis will not accommodate the latch hardware.

Hologic Magnetic Latches were cut in on production Panther Systems P1600 and above.
These Hologic latches are on the right (closest to the right side door) as you face the instrument.

Mandatory Install on Factory Installed
P0100 - P1600 P1601 - P1937

Stratec designed UFD Magnetic Latches were cut in on production Panther Systems P1937 and above.
These Stratec latches are on the left of the UFD as you face the instrument.

Factory Installed
P1937 and above

Panther Improved Bottle Caps & Straws were cut in on production Panther Systems P1875 and above.

Install on Failure Factory Installed
P0000 - P1874 P1875 and above

ClosedVacuum System Module

See Panther Vacuum Module page for cut in information.

The Odorcarb Vacuum filter MUST be replaced every 12 months (from the date of install).

Thermal Sensor Ranges for Aptima Assays

ClosedWaste Drawer Module

No Latches can be installed on Systems 001 - 0099 as the frame / chassis will not accommodate the latch hardware.

Hologic Magnetic Latches were cut in on production Panther Systems P1600 and above.
These latches are on the left (closest to the drawer interlock) as you face the instrument.

Mandatory Install on Factory Installed
P0100 - P1600 P1601 - P1937

Stratec designed WD Magnetic Latches were cut in on production Panther Systems P1937 and above.
These Stratec latches are on the right of the WD as you face the instrument.

Factory Installed
P1937 and above

Panther Mid-Bay Shields above Waste Drawer were cut in on production Panther Systems P0375 and above.

Factory Installed
P0375 - 1990

Panther Mid-Bay Shields above Waste Drawer with Wider cut out cut in on production Panther Systems P1900 and above.

Factory Installed
P1900 and above

Panther Waste Fittings (Polysulfone) were cut in on production Panther Systems P0674 and above.

Install on Failure Factory Installed
P0000 - P0673 P0674 and above

The Odorcarb Vacuum filter MUST be replaced every 12 months (from the date of install).

ClosedFusion

ClosedThermocycler

Vial Cleaning Nests

Install on Factory Installed
F0000 - F00245 F0246 and above

ClosedExternal Component Modules

ClosedChassis

Panther Dual Chassis Fans were cut in on production Panther Systems PXXXX and above.

Install Optional Factory Installed
P0000 - PXXXX PXXXX and above

Panther Track Ready Hole was cut in on production Panther Systems P1937 and above.

Can be Installed as needed Factory Installed
P0000 - P1936 P1937 and above

Panther UDI Tracking Label was cut in on production Panther Systems P2242 and above.

Install as needed Factory Installed Required for Panther Required for Fusion
P0000 - P2241 P2242 and above Yes/No Yes/No

ClosedPrinters

Panther Systems with an HP Officejet Printer may need to have the Auto Shutoff Feature Disabled.

ClosedUninterruptible Power Supply (UPS) Module

ALL Fusion Installs require the Output Voltage on the UPS to be set at 220V.