Panther PLUS Continuous Access Waste Installation
Continuous Access Waste includes the following:
- Solid Waste on the Fly
- Tip Carousel
- Catcher
- Upgraded Waste Drawer
- Liquid Waste on the Fly
- Permanent and Removable Liquid Waste Bottles
- Universal Fluids on the Fly
To install a PLUS module, the System requires the following:
- Panther Plus can only be installed on Panther Systems Serial #00375 and above.
- PCAP Monitor required if installing Expansion ONLY
- Dell XE3
- Software v7.x and above
- Waste to Drain - drain must be able to handle a minimum flowrate of 1L/min.
- Waste to Drain - drain must be 15m (49ft) or less from the Waste to Drain pump.
- Waste to Drain - drain must be no higher than 1.2m (3.9ft) from the floor
Parts and Materials Required
- Panther Tool Kit
- CONTINUOUS ACCESS KIT with Full ASSEMBLED WASTE DWR
- Dimensions
- (82cm x 122cm x 163cm @ 47kg)
- (32in x 48in x 64in @ 105lbs)
CONTINUOUS ACCESS KIT W/ DWR UPGRADE PARTS
- Tip Carousel with CAN cable
- Tiplet Catcher
- Removable Waste Bottle
- Vacuum Bottle
- Filter Block with Screw
- Vacuum Filter
- Waste Bottle Coupling Block
- Pump Housing
- Vacuum Interface Tubing
- Waste Interface Tubing
- Waste Drawer Y-Splitter CAN Cable
- CAN Extension Adapter
- CAN Jumper
- Waste Bag Sensor Cable Assembly
- Full/Empty Sensor Cable
- Vacuum Bottle Float Sensor Cable Assembly
- 1/4" ID Tubing
- 1/8" RED ID Tubing
- Vacuum Bottle Riser Tubing
- Vacuum Filter Bracket
- Bellows Transfer Pump
- New UFD Drawer labels
- Vacuum Grease
Time Required
Procedure
- Unboxing Waste on the Fly
- Solid Waste on the Fly Module Installation Procedure
- Liquid Waste on the Fly Module Installation Procedure
- LWOTF, New Complete Waste Drawer Installation
- GRIFOLS ONLY - LWOTF, Existing Waste Drawer Upgrade
- Universal Fluids on the Fly Module Installation Procedure
- Firmware, Alignment and Teaching
Operational Qualification
- Continuous Access Waste Verification
Click the
button at the top of the page to send feedback, comments, or change requests.