Check 24V Power Supply Screw Connection
Purpose
This procedure is for FSEs to check the connections at the 24V Power Supply.
What is Affected
Loose screws on the 24V Power Supply can cause a "supply voltage out of range" message. This will stop assay processing.
Procedure
- Power down the Panther System.
- Unplug the main power cable.
- Open the left side panel door.
- Verify that the 4 power supply connections are securely screwed into the power supply.
button at the top of the page to send feedback, comments, or change requests.