Safely Powering On the System

Parts and Materials Required

  • None

Procedure

  1. ClosedTurn the Power Switch, located on the back left side of the system, to the On position.

    Green and orange LED lights illuminate on the Panther and Fusion COPs.

  2. Wait until no orange lights are lit.

    At this point, only flashing green LEDs will be present.

    The system is now powered on and ready to be used.