Crating the Panther System
Parts and Materials Required
- Cordless drill with Phillips bit #2
- Empty Panther System crate and packing material
Procedure
Ensure the Packing Preparation procedure has been completed, then cover the system with plastic covering. The system is now ready for crating.
Prepare the empty crate for shipping. On the front side of the crate, remove the 2 screws that secure the ramp board.
Unfold the two ramp supports and place the ramp support board between them. Secure the ramp support board with 2 screws.
Remove any screws that secure the ramp to the crate.
Lower the ramp.
Place the thin board between the crate and the ramp.
Place the ramp board at the end of the ramp.
On the back side of the crate, remove the 12 screws from the upper panel.- Carefully push the system up the ramp and into the crate.
Screw in the 4 screws that secure the 2 holding blocks.
Insert packing foam on the left and right side of the system.
Place the ramp flat across the top of the holding block.
Remove the thin board between the ramp and the crate and put inside the system.
Raise the ramp and screw in the 14 screws that secure the ramp into place.- Place the packing foam in the front of the system.
Screw in the 12 screws that secure the upper plate in place.- The Panther System is ready to be shipped.
button at the top of the page to send feedback, comments, or change requests.